Yes, installation is included with purchase.
A Gorilla Shed representative will contact you within 3-5 business days of your purchase date to review your order and schedule installation. The representative will also confirm your shingle color, optional paint color and any accessories at this time.
4-6 weeks from purchase.
A person at least 18 years of age will need to be present at the time of installation. You do not need to be home once the installation process has begun, but you should be home at completion for a walk through and to sign the certificate of completion.
One professional installer will be assigned to each build and the installation time will range from 6-10 hours. Time varies based upon location, leveling, and carry time at the assembly site.
Our sheds meet or exceed 40 pounds per square foot.
Our sheds have been designed and engineered to meet approximately 90 M.P.H. wind speeds and between 20 and 30 pounds of ground snow load depending on the shed model.
Contact us at 888-827-9056. We will communicate your refund to Costco who can process your refund when you return to the warehouse. To add an item, we will provide you a new order form that you take to the closest warehouse to process your purchase.
There is a 15-year material warranty on Gorilla sheds and a 1-year warranty on labor.
The Member is responsible for removal prior to your scheduled delivery date. This is only required if the new Gorilla Shed is to be assembled in the same location.
Leveling blocks are not required in all states/counties, but the member should check his/her local requirements. Your building will be built on 4x4 pressure treated runners. We will use treated leveling materials and shingle shims to level up the floor prior to installing the shed. If your ground is out of level greater than 6 inches, leveling blocks will be needed. Leveling blocks are not included with purchase.
You should check with your local Building Authority and Homeowners Association prior to installation to make sure your shed is compliant with all codes, easements and setbacks.
Painting is not included with purchase and is the homeowner’s responsibility. Gorilla sheds are built using pre-primed siding. Manufacturer requires the use of 100% acrylic latex paint. All exterior horizontal and vertical joints must be painted. Doors should be painted on all 6 sides including front, back, and all four edges. Painting your shed to match your home often meets HOA requirements.
As a Costco Member Exclusive, Gorilla Sheds will caulk all critical joints (addressed during installation). All additional caulking is at homeowner’s responsibility. Your shed is built like your home and should be caulked when painting. Manufacturer recommends paintable caulk. You should caulk all horizontal and vertical joints and any seams and gaps prior to painting.
Your shed should be caulked and painted within 30 days after installation. Check with your Homeowners Association to ensure compliance with architectural codes.
Our sheds are manufactured with the upmost precision to ensure every building meets our engineering standards. Once your shed is installed, be sure to caulk all remaining joints besides those critical joints already caulked by Gorilla Sheds as a Member Exclusive. Following these simple steps will prevent water from entering your shed.